top of page
THE DARK LINE BY MICHÈLE & MIQUEL AND dA VISION DESIGN
METALOCUS
2023年5月18日

It has been necessary to carry out important works to allow the opening to the public of this itinerary: going through a tunnel subject to possible landslides, installing a walkway on the ground, "without touching it", building a complex structure on a vertical and unstable ground,... and all without cutting any trees.
The challenge was to make it as discreet and "natural" as possible.
bottom of page